LBI & Southern Ocean County, NJ — lagoons, the open bay & Long Beach Island Free for homeowners — the contractors pay us, never you

Brick Township

Cherry Quay bulkhead & shoreline work

Lagoon & canal communities

Part of Brick Township, Cherry Quay is a waterfront lagoon neighbourhood on the Barnegat Bay side of Brick Township.

The waterfront here. Small-scale bayfront and lagoon homes with a settled community feel, bulkheaded frontage throughout and steady rebuilding on the lower ground.

The water. Cut lagoon frontage with a short run out to Barnegat Bay, more exposed on the outer lots than the sheltered interior runs.

Cherry Quay is an established waterfront neighbourhood bordering the northern end of Barnegat Bay, and it is one of the earlier lagoon communities in Brick Township — its major growth period came in the 1950s, ahead of the larger lagoon grids dredged in the township later. That matters directly: an original wall here is older than an original wall in the developments that followed, and a first-generation timber system of that vintage is well past the point where it can be assumed sound. The second local factor is position: the outer lots have a short run to open Barnegat Bay and take more wind-driven energy than the interior canal frontage, so exposure varies meaningfully across a small area. The underlying ageing is the same as the rest of the northern lagoon belt — sheltered water, slow failure, rot at the tide line and corrosion in the anchors — but the answer to what a given Cherry Quay lot needs depends more on that specific wall than on the neighbourhood.

Working here. Established streets with mature planting, so side-yard access varies considerably from lot to lot and barge work is used where it does not exist.

Around Cherry Quay. The work comes from the lagoon streets running back from the bay; the outer lots with the shortest run to open water; the interior canal frontage; the older established waterfront blocks.

On cost here. An older wall is not automatically a replacement — some are candidates for refacing or a tie-back repair where a neighbour needs the full job. Access varies with mature planting, and the outer lots can warrant toe protection the interior runs do not.

Cherry Quay grew mainly in the 1950s, earlier than the big lagoon grids dredged elsewhere in Brick, so its original walls are among the oldest in the township's waterfront stock.

The outer lots have a short run to open Barnegat Bay and take real wind-driven energy, while the interior canal frontage a street away is sheltered, so exposure changes sharply across a small neighbourhood.

Cherry Quay is in Brick Township, so permits go through the township construction office, and tidal lagoon and bay frontage brings NJDEP waterfront development or CAFRA review and tidelands documentation into the process.

Trying to get a rough number?

Share the details and we'll get them to local contractors who handle this. Nothing to pay, nothing to commit to.

Tell us what's happening in Cherry Quay →

Most relevant here

What comes up in Cherry Quay

Relevant to how these houses are built and where they sit.

Vinyl bulkhead replacement in Cherry Quay

A full new wall in marine-grade vinyl sheet pile — the standard replacement on the bay. Driven, tied back to deadman anchors, and capped.

$200 – $450 per linear foot, typical range, not a quote

Tie-back and deadman anchor repair in Cherry Quay

New tie rods, deadman anchors, or helical tie-backs to stop a wall that is leaning out and pull it back plumb while it can still be saved.

$400 – $1,500 per tie-back, typical range, not a quote

Dock and pier repair in Cherry Quay

Re-decking, new framing, or resetting a dock or pier — usually the same crew and permit as your bulkhead, so often done together.

$2,000 – $20,000 typical range, not a quote

Nearby

Other towns we cover

Similar ground, similar problems.